India and Indonesia are just entering their high-concrete phase of development. Over the next 40 years, the newly built floor area in the …


Construction Cost Estimator Calculator. Thumb rule for calculation; Average cost of construting a resedential ternament region may very from Rs. 800/Sq. ft. - Rs. 2,500/Sq. ft. depending open quality of material. This cost includes entire cost of labour and material from excavation to fitting of doors and window with eletrical wiring and ...


Item No. Item Unit Rate Remark 712 Plum cement concrete 1:4:8 with 75% graded metal of maximum size 40 mm and 25% plums of 150 mm size. cum 1455.00 713 Cement concrete 1:1:2 with graded metal of maximum size (a) 63 mm cum 3370.00 (b) 40 mm cum 3443.00 (c) 20 mm cum 3545.00 (d) 12.5 mm cum 3588.00


So, Rate for 1 cum of M-15 concrete is = 4570.00. Note. Shuttering component is not considered as the quantity of shuttering for the slab, beam, column and foundation shall be different. The material rates considered in this rate analysis are exclusive of GST. The material and labour rates may vary depending on the site condition & type of project.


T r i c o n B u i l d e r s – The Makers of India's Finest Designer Homes Page 2 ANNEXURE-1 RATE & SPECIFICATIONS FOR CONSTRUCTION ON TURNKEY BASIS Rs.1900/- to Rs.2250/- per Sq.Ft_ Our rate for the full work starts from Rs.1900/- per Sq.Ft & may go upto Rs.2250/-


THE CONCRETE ASSOCIATION OF INDIA 0.4 The Indian Standard Methods of Sampling and Analysis of Concrete ( IS: 1199-1959) is a necessary adjunct to this standard. Besides, this standard requires reference to the following Indian Standards:-IS:269-1958 SPECIFICATION FOR ORDINARY, RAPID-HARDENING AND


It is preferred when a workspace is limited on a construction site and making concrete on site is a too difficult a task. Some time Ready Mix Concrete used because the quality of concrete is more important. As per the requirement and use RMC is categorized into M-20, M-25, M-30, M-35, etc. RMC Price: 3000 to 7500 Rs. As per grade of Concrete.


Concrete masonry Hollow Blocks are manufactured with 2150 Kg/m3 concrete density for normal weight blocks and 1100 Kg/m3 concrete density for light-weight concrete blocks. Hollow blocks are the most commonly used masonry unit. They find application in interior use, because of its higher fire rating and better sound absorbing properties.


concrete, steel work and shuttering, masonry etc. 2. LITERATURE REVIEW 2.1 Concrete Productivity A study by Polat, G and Arditi, P in 2005 involves, case study of various sites regarding the productivity of concrete. This study involves collection of data information speed on concrete placing, time of concreting, volume, rate of


Get More Information

CONCRETE BLOCK MASONRY

Introduction These are the concrete blocks either hollow or solid. A hollow unit is that unit which has core void area greater than 25% of the gross area. They may be used for both load bearing as well as non load bearing walls.


Specifications Outline Dimension: 5226-2200*5460 mm - Motor Power: 17.25 kW - Speed of Mixing Drum: 13 r/min In order to furnish the variegated desires of our clients, we have brought forth an extensive consignment of Ready Mix Concrete Machine.


Get More Information

Unit Rate Calculator

Calculator Use. Find the unit rate or unit price with this calculator. A rate is a ratio comparing quantities of different items. A unit rate is a rate with 1 in the denominator. If you have a rate, such as price per some number of items, and the quantity in the denominator is not 1, you can calculate unit rate or price per unit by completing the division operation: numerator divided by ...


Rate Analysis for Concrete WorkJoin this Training and get started:- https://civilguruji.page.link/fzFXZ5ZTkcy1xR7U9For More Details Call Now: 9111001234About...


CEMENT- A bag of cement costs around 300 rupees. To build a house in 600 sqft we need around 250 bags of cement that will cost us near 75,000 rupees. STEEL- Steel costs 45 rs/kg. We require around 1.5 metric ton (or 15 quintals) that costs us 67,500 rupees. SAND- It costs 50 rs/cubic foot (cuft) and we require 1100 cuft of this.


characteristics of the concrete required are incorporated in the design procedure. 2.2 Grade Designation According to Yunusa (2011) every concrete has its strength in N/mm2 when subject to test after 28 days of curing in any medium. The choice of concrete grade, depends on the purpose and usage as follows: Table 1: Concrete Grade Designation


Description for 79 SUNCREST Unit. DOUBLE WIDE MOBILE HOME ON A CONCRETE SLAB, COMPLETELY DRYWALLED THROUGHOUT, WITH 60 FT FRONT YARD & 60 FT BACKYARD. This home boasts 3 bedrooms, 1 bathroom, spacious foyer, huge eat-in kitchen with loads of cabinetry, large formal dining area and open concept living room. Spacious Laundry room …


Density is also called as unit weight of substance. It is represented by symbol called row ( p). Density represents the degree of compactness of material. If the material is of more density, it is more compacted material. Density is defined as the ratio of mass to volume. p = m/v Units = kg/m 3 or lb/ft 3 Conversion: 1 kg/m 3 = 0.624 lb/ft 3.


Its values can vary from structure to structure, and can be assumed from past experiences of similar structure. For slabs = 1.0 % of concrete volume. For Beam = 2 % concrete volume. For column = 2.5 % of concrete volume. For RCC Roads, 0.6% concrete volume.


Get More Information

ANALYSIS OF RATES

Description Unit Rate Rs. P Amount Rs. P Remarks 12 34567 1(a) Earth work in oridinary soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum. i) Labour


(Note 2: For pumpable concrete or congested reinforcement in structure the coarse aggregate proportion may be reduced up to 10%) Hence,Volume of coarse aggregate per unit volume of total Volume of concrete = 0.62 x 90% = 0.558. Volume …


Composite Rate Build Up - Foundations The Elemental Estimate layout and grouping of items will be used in this example. There are principles that you have to follow when building up composite rates for Approximate Quantities. We are going to illustrate a composite rate build-up for Foundations: Excavate trench 600mm wide and 700mm deep, with…


concrete technology is being used widely by many countries around the world, which is one of the most cost effective and quality monitored system.India is an infrastructure starved country. With the rise in technology, the construction boom in India is developing at a fast growth rate. It provides a wide spectrum for the


(Format for Rate Analysis of Cement Concrete items) Cement Concrete 1:1.5:3 Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes P-26, IT no- 10 of PWD Building Schedule of Rates 4248.00


1) Laying reinforced concrete – 3 beldars, 3 mazdoors, 1½ Bhisti and ½ mason can do 2.83 cum (100cuft) per day. 2) Centering and shuttering for flat surfaces – 4 beldars and 4 carpenters (II class) can do 9.6sqm (96sqft) per day.


Niraj Cement Structurals Ltd – NCSL is one of the top ready-mixed concrete manufacturers in India. NCSL is currently operating ready-mixed concrete plants in various parts of cities and towns across the country. Address: Near Deonar bus Depo, Chembur Mumbai-400088. Contact Number: +91 22 2551 3541.


Solid Concrete Bricks 12"x 8"x 6" 24.50: Per Piece: Solid Concrete Bricks 16"x 8"x 4" 28.00: Per Piece: Solid Concrete Bricks 16"x 8"x 6" 32.96: Per Piece: Hollow Concrete Brick With Single Hole 16"x 8"x 4" 28.00: Per Piece: Hollow Concrete Brick With Double Hole 16"x 8"x 6" 28.00: Per Piece: Hollow Concrete Brick With Pipe Hole 16"x 8"x 8" 28 ...


Hence, to prepare 1 cubic meter of M20, M15 and M10 concrete, 1.57 cubic meters of "total dry volume" of cement, sand and aggregate are needed, whereas to prepare 1 cubic meter of M7.5 and M5 concrete, 1.52 cubic meters of "total dry volume" of cement, sand and aggregate are needed. Many websites are giving different values for the "total dry volume" of the ingredients.


What is Rate Analysis? The basis of arriving at a correct and reasonable rate per unit.work or supply for a particular item following its specification and detail survey of materials, labour, equipment, etc. as required for the unit work, and their prevailing rates may be called as an analysis of rate.. The procedure of analyzing the rate per unit of an item has been described.


Find Oil-Free Industrial Oil Free Screw Air Compressor (Maximum Flow Rate 240 Cfm) at Price 750000 INR/Unit in Kathwada, Ahmedabad. Buy Oil-Free Industrial Oil Free Screw Air Compressor (Maximum Flow Rate 240 Cfm) from Empire Compressor Private Limited with minimum order quantity 1 Unit.


b) Cement concrete work per 2.83 cum (100cuft) laying cement concrete – 2 beldars, 3 mazdoors, ¾ bhisti and ¼ mason, can do 2.83 cum (100 cuft) per day. c) R C C work:- 1) Laying reinforced concrete – 3 beldars, 3 mazdoors, 1½ Bhisti and …


Answer: Volume=1000*5.5*0.15 in mtrs Volume=825m³ For ex:As per MORTH specifications BC-II Mix need 5% (60 g)of bitumen(VG-30) for Marshall specimen of 1200g . Density=mass/volume Density of bituminous mix=2300kg/m³ 2300=mass/825m³ Mass=1897500kg bitumen required for your volume 1200g mix ...